info@uslpore.com +49-30-23321149-0
icon facebook icon instagram icon youtube icon linkedin icon info
True Pore Technology
Innovative technology for aeration of construction materials
for insulation purposes and
reduction of your carbon dioxide footprint

Formwork

USLPore® can be poured directly at site into a form work. Compared to competitors the density is remaining constant during the hardening process.

  • Time and costs saving construction method
  • Consistency of density for full wall height
  • Fireproofed construction material
  • Sustainable construction material

USLPore® using form work can be applied to cast monolithic walls at site. First the form work has to be installed, than USLPore® will be manufactured and pumped into the form work. Depending on the applied density the form work can be removed after 24-48 hours already. The use of USLPore® technology in opposite to other competitor products is leading to an excellent stability and therefore a completely consistent result. There is no variation in density if different parts of the wall are controlled by density. With USLPore® using form work walls up to 3 meters in height can be poured.
The density can be varying between 200 kg/m² for non-load bearing walls up to 1400 kg/m³ for load bearing walls. 

USLPore® foam concrete for filling in formwork can be produced at different densities. The density below is representing the average applied density of our customers for the respective application.
A higher density is resulting in a higher compressive strength but lower insulating effect.
A lower density is resulting in a lower compressive strength but better insulating effect.
All USLPore® products are fully non-combustible.

  metric imperial
entity value entity value
density [kg/m³] 200-1400 [pcf] 12.5-87.4
thermal [W/mK] 0.06 - 0.47 [R-value per in] 0.3-2.4
compression [MPa] 0.35-12 [PSI] 51-1764
×
< >