USLPore® using form work can be applied to cast monolithic walls at site. First the form work has to be installed, than USLPore® will be manufactured and pumped into the form work. Depending on the applied density the form work can be removed after 24-48 hours already. The use of USLPore® technology in opposite to other competitor products is leading to an excellent stability and therefore a completely consistent result. There is no variation in density if different parts of the wall are controlled by density. With USLPore® using form work walls up to 3 meters in height can be poured.
The density can be varying between 200 kg/m² for non-load bearing walls up to 1400 kg/m³ for load bearing walls.
info@uslpore.com
+49-30-23321149-0
True Pore Technology
Innovative technology for aeration of construction materialsfor insulation purposes and
reduction of your carbon dioxide footprint
Formwork
USLPore® can be poured directly at site into a form work. Compared to competitors the density is remaining constant during the hardening process.
- Time and costs saving construction method
- Consistency of density for full wall height
- Fireproofed construction material
- Sustainable construction material
Projects
USLPore® foam concrete for filling in formwork can be produced at different densities. The density below is representing the average applied density of our customers for the respective application.
A higher density is resulting in a higher compressive strength but lower insulating effect.
A lower density is resulting in a lower compressive strength but better insulating effect.
All USLPore® products are fully non-combustible.
metric | imperial | |||
entity | value | entity | value | |
density | [kg/m³] | 200-1400 | [pcf] | 12.5-87.4 |
thermal | [W/mK] | 0.06 - 0.47 | [R-value per in] | 0.3-2.4 |
compression | [MPa] | 0.35-12 | [PSI] | 51-1764 |
- 2405_uslpore_formwork_tds_en.pdf (303KB)